Canada Place East & West Promenade, Vancouver, BC
Canada Place is Vancouver’s cruise ship terminal, and the pedestrian-only promenades on its upper levels carry the crowds that arrive with every sailing. When the Port of Vancouver revitalized the East and West Promenade, the new permeable natural stone paving had to fit a shallow build-up over a structural slab, clear winter rain across very little slope, and survive constant pressure washing, all installed between cruise seasons. Designed by Omicron, the roughly 35,000 square foot project went in over two winters: the East Promenade by Bridgewater Surfaces in 2025 and the West Promenade by Sterling Floor & Tile in 2026.
PRODUCT SELECTION
The promenades were built as a ROMEX RSG-10 fully bonded system, chosen around the granite. ROMEX TRASS BED is the setting bed and the drainage layer in one. It provides a solid foundation, resists frost, and drains at published rates up to 700 inches per hour. ROMEX ADHESION ELUTRIANT, a polymer-enhanced thin-set on the back of each stone, bonds the granite to the fresh bed so no unit can shift or rock.
ROMEX D1 commercial resin jointing matches the 2017 North Point Plaza Deck renovation, keeping the jointing consistent across the facility as the Port requested. It is permeable, pressure washer safe, and well equipped to deal with the climate and high volume of pedestrian traffic.
ROMEX FLEX JOINT, a flexible, permeable mortar of sand, rubber, and viscoelastic resin, fills the control joints that relieve the rigid bonded field.
PROJECT LOCATION
Canada Place sits on a pier in Burrard Inlet at the north edge of downtown Vancouver, alongside the Vancouver Convention Centre and facing the North Shore mountains. Vancouver winters are mild but wet, with heavy rain from fall through spring and periodic freeze-thaw nights. Cruise season brings the heaviest foot traffic of the year.
PROJECT NEEDS
The paving had to fit a limited build-up over the existing structural slab with very little slope, yet it must shed winter rain without ponding or trapping water through freeze-thaw cycles. As a portside structure, the building moves, so the bonded surface needed a way to absorb that movement without cracking or delaminating.
In a space this busy, lippage and loose stones are slip, trip, and fall hazards. Maintenance crews pressure wash the promenades frequently, which blows out conventional joint material. All work had to happen in the off-peak winter months, with the surface open again for the next cruise season.
PROJECT SOLUTION
Because TRASS BED acts as both slab and setting bed, the granite assembly fit the available depth. Rain passes through the D1 joints and the bed to the structural slab, then runs to slab-level drains and a designated discharge point. Surface catchment drains along the gentle falls tie into the building’s existing drainage. With no water trapped in the assembly to freeze, stones stay put through winter.
Bonding every stone locked the granite into a flat, continuous surface, and both installation crews delivered the lippage-free finish the Port required. FLEX JOINT control joints, set at closer intervals than usual, let the field move with the building without stressing the stone.
The deciding factor was lifecycle cost. D1 and FLEX JOINT are pressure washer safe, so crews can clean as often as the season demands without blowing out joints or resetting stones. With the assembly covered by the RSG-10 ten-year manufacturer warranty, the Port has a promenade it can clean hard, fill with peak crowds, and plan around rather than repair.
Permeable paving for durability and coastal resilience
Canada Place, Vancouver, BC
2025 & 2026
Commercial